Material Cost Calculator BOQ & Materials
BOQ thumb-rule coefficient estimation: quantities & costs for cement bags, TMT steel (kg/tonnes), sand, aggregates, bricks, tiles, and paint
BOQ Parameters & Rates
Standard Thumb Rules
sq.ft
Unit Material Market Prices
₹
/bag
₹
/kg
₹
/cft
₹
/cft
₹
/pc
₹
/sq.ft
₹
/sq.ft
Total Material Cost
₹18,52,600
₹18.53 Lakhs
Labour Contract Cost
₹9,00,000
₹9.00 Lakhs
Cement + Steel Share
44.3%
₹8,20,800
Total Raw Build Cost
₹27,52,600
₹1,376/sq.ftRaw Material Expenditure Distribution
BOQ WeightageBill of Quantities (BOQ) Thumb Rule Schedule
| Material / Item | Thumb Rule Factor | Required Qty | Unit Price | Total Cost | Share % |
|---|
Standard IS:1200 Material Estimation Formulas
Thumb rule approximations are based on standard G+1 to G+3 RCC framed residential structures. Actual steel consumption may increase to 4.5–5.0 kg/sq.ft for seismic zone IV/V, deep raft foundations, or large cantilevers. A 5% transit wastage buffer for bricks and sand is factored into the coefficients.