Material Cost Calculator BOQ & Materials

BOQ thumb-rule coefficient estimation: quantities & costs for cement bags, TMT steel (kg/tonnes), sand, aggregates, bricks, tiles, and paint

BOQ Parameters & Rates
Standard Thumb Rules
sq.ft
Unit Material Market Prices
₹ /bag
Thumb rule: 0.40 bags per sq.ft built-up
₹ /kg
Thumb rule: 3.8 kg per sq.ft built-up
₹ /cft
Thumb rule: 1.8 cu.ft per sq.ft built-up
₹ /cft
Thumb rule: 1.35 cu.ft per sq.ft built-up
₹ /pc
Thumb rule: 18 bricks per sq.ft built-up
₹ /sq.ft
Thumb rule: 1.20 sq.ft tile per sq.ft floor area
₹ /sq.ft
Includes shuttering, bar bending, masonry & plaster labour
Total Material Cost

₹18,52,600

₹18.53 Lakhs
Labour Contract Cost

₹9,00,000

₹9.00 Lakhs
Cement + Steel Share

44.3%

₹8,20,800
Total Raw Build Cost

₹27,52,600

₹1,376/sq.ft
Raw Material Expenditure Distribution
BOQ Weightage
Bill of Quantities (BOQ) Thumb Rule Schedule
Material / Item Thumb Rule Factor Required Qty Unit Price Total Cost Share %
Standard IS:1200 Material Estimation Formulas Thumb rule approximations are based on standard G+1 to G+3 RCC framed residential structures. Actual steel consumption may increase to 4.5–5.0 kg/sq.ft for seismic zone IV/V, deep raft foundations, or large cantilevers. A 5% transit wastage buffer for bricks and sand is factored into the coefficients.