Construction Cost Calculator Cost Estimation

Estimate total residential and commercial construction costs by built-up area, specification grade (Basic, Standard, Premium, Luxury), and consultancy fees

Construction Specifications
CPWD / IS 456 Standards
sq.ft
500 sq.ft 5,000 sq.ft 10,000 sq.ft
Basic ₹1,500/sq.ft
Red brick, basic vitrified 2x2, standard bath fittings
Standard ₹1,950/sq.ft
AAC blocks, 4x2 GVT tiles, Jaguar fixtures, flush doors
Premium ₹2,600/sq.ft
Italian marble foyer, Kohler fittings, false ceiling, teak frame
Luxury ₹3,500/sq.ft
Designer architecture, VRV HVAC, home automation, double-glazed
Custom Base Construction Rate:
₹ /sq.ft
Storeys
1 (Ground only) 3 (G+2) 6 (G+5)
₹
₹0 (None) ₹5 Lakhs ₹10 Lakhs
%
0% 5% (Standard) 12%
%
0% 5% (Recommended) 15%
Total Estimated Cost

₹56,43,750

₹56.44 Lakhs
Effective Rate / Sq.Ft

₹2,258

All-inclusive rate
Hard Civil & Structure

₹31,76,250

62% of superstructure
Finishing, MEP & Fitouts

₹19,48,750

38% of superstructure
Construction Cost Breakdown
Civil vs Finishing vs Consultancy
  • RCC Structure & Masonry (62%) ₹31,76,250
  • Finishing, MEP & Flooring (38%) ₹19,48,750
  • Compound Wall & Gate ₹2,50,000
  • Architect & PMC Fees ₹2,56,250
  • Contingency & Escalation ₹2,56,250
Detailed Bill of Cost (BOC) Schedule
Cost Component Share % Unit Rate Total Amount Scope / Deliverable
RCC Frame & Footings 34.0% ₹741/sq.ft ₹18,52,500 Excavation, TMT steel, ready-mix/manual concrete
Brickwork & Plastering 28.0% ₹610/sq.ft ₹15,25,000 Internal 4.5" & external 9" masonry, dual plaster
Flooring & Tiling 14.0% ₹305/sq.ft ₹7,62,500 Living/bed vitrified, anti-skid bath, granite treads
Electrical & Plumbing 13.0% ₹283/sq.ft ₹7,07,500 Concealed conduits, CPVC pipes, sanitary & CP fittings
Painting, Doors & Windows 11.0% ₹240/sq.ft ₹6,00,000 Emulsion paint, UPVC windows, flush/panel doors
Boundary & Compound Wall — Lumpsum ₹2,50,000 Boundary masonry, coping, MS main gate
Architect & Engineering 5.0% Fee % ₹2,56,250 Architectural blueprints, structural design, site visits
Escalation & Contingency 5.0% Buffer % ₹2,56,250 Material price inflation & unexpected site changes
TOTAL ESTIMATED BUDGET 100% ₹2,258/sq.ft ₹56,43,750 Turnkey Handover
Civil Construction Best Practices (IS 456:2000 & NBC 2016) Actual construction costs vary by geographic tier (Tier-1 metro vs Tier-2/3), soil bearing capacity (pile foundation requires 15-20% higher foundation budget), and high-rise vertical pumping above 4 floors. Maintain an escalation buffer of 5-8% to hedge against steel and cement commodity price swings during the 12-18 month execution window.