Construction Cost Calculator Cost Estimation
Estimate total residential and commercial construction costs by built-up area, specification grade (Basic, Standard, Premium, Luxury), and consultancy fees
Construction Specifications
CPWD / IS 456 Standards
sq.ft
500 sq.ft
5,000 sq.ft
10,000 sq.ft
Basic
₹1,500/sq.ft
Red brick, basic vitrified 2x2, standard bath fittings
Standard
₹1,950/sq.ft
AAC blocks, 4x2 GVT tiles, Jaguar fixtures, flush doors
Premium
₹2,600/sq.ft
Italian marble foyer, Kohler fittings, false ceiling, teak frame
Luxury
₹3,500/sq.ft
Designer architecture, VRV HVAC, home automation, double-glazed
Custom Base Construction Rate:
₹
/sq.ft
Storeys
1 (Ground only)
3 (G+2)
6 (G+5)
₹
₹0 (None)
₹5 Lakhs
₹10 Lakhs
%
0%
5% (Standard)
12%
%
0%
5% (Recommended)
15%
Total Estimated Cost
₹56,43,750
₹56.44 Lakhs
Effective Rate / Sq.Ft
₹2,258
All-inclusive rate
Hard Civil & Structure
₹31,76,250
62% of superstructure
Finishing, MEP & Fitouts
₹19,48,750
38% of superstructureConstruction Cost Breakdown
Civil vs Finishing vs Consultancy- RCC Structure & Masonry (62%) ₹31,76,250
- Finishing, MEP & Flooring (38%) ₹19,48,750
- Compound Wall & Gate ₹2,50,000
- Architect & PMC Fees ₹2,56,250
- Contingency & Escalation ₹2,56,250
Detailed Bill of Cost (BOC) Schedule
| Cost Component | Share % | Unit Rate | Total Amount | Scope / Deliverable |
|---|---|---|---|---|
| RCC Frame & Footings | 34.0% | ₹741/sq.ft | ₹18,52,500 | Excavation, TMT steel, ready-mix/manual concrete |
| Brickwork & Plastering | 28.0% | ₹610/sq.ft | ₹15,25,000 | Internal 4.5" & external 9" masonry, dual plaster |
| Flooring & Tiling | 14.0% | ₹305/sq.ft | ₹7,62,500 | Living/bed vitrified, anti-skid bath, granite treads |
| Electrical & Plumbing | 13.0% | ₹283/sq.ft | ₹7,07,500 | Concealed conduits, CPVC pipes, sanitary & CP fittings |
| Painting, Doors & Windows | 11.0% | ₹240/sq.ft | ₹6,00,000 | Emulsion paint, UPVC windows, flush/panel doors |
| Boundary & Compound Wall | — | Lumpsum | ₹2,50,000 | Boundary masonry, coping, MS main gate |
| Architect & Engineering | 5.0% | Fee % | ₹2,56,250 | Architectural blueprints, structural design, site visits |
| Escalation & Contingency | 5.0% | Buffer % | ₹2,56,250 | Material price inflation & unexpected site changes |
| TOTAL ESTIMATED BUDGET | 100% | ₹2,258/sq.ft | ₹56,43,750 | Turnkey Handover |
Civil Construction Best Practices (IS 456:2000 & NBC 2016)
Actual construction costs vary by geographic tier (Tier-1 metro vs Tier-2/3), soil bearing capacity (pile foundation requires 15-20% higher foundation budget), and high-rise vertical pumping above 4 floors. Maintain an escalation buffer of 5-8% to hedge against steel and cement commodity price swings during the 12-18 month execution window.